East Greenbush Community Library Heat Pump Replacement

10 Community Way
East Greenbush, NY 12061

Summary of Work

Replace existing water source heat pump systems along with associated ductwork, piping, wiring, controls and components etc. to provide the complete installation of heat pump upgrades. This work is to be done in two Phases over two different time periods.

  • Phase One: completion 4/30/2018
  • Phase Two: 4/30/2019

Pre-Bid walkthrough with the engineer, at the site, 10am, Friday, August 25, 2017. Any other site visitation shall be coordinated 48 hours in advance with Jill Dugas Hughes, Director, East Greenbush Community Library, 518-477-7476 ext. 109. However, the Engineer will not be present. Questions received after 12pm on August 29th, 2017 cannot be answered. Project Manager for Engineer: Daniel Hampson, PE Greenman-Pedersen, Inc. Dhampson@GPInet.com. Bids shall be received at East Greenbush Community Library until 1pm on September 8, 2017. Bids will be opened publicly at that time. The Owner will award a Contract, if at all, as soon as possible following the opening of Bids.