Outdoor Community Space Update

Preliminary Drawing

Preliminary Drawing for Outdoor Space

Outdoor Space FAQ

Photos:

November 2013:

sidewalk area carved out

Making Room

sidewalk foundation

Next Step

sidewalk before concrete

Almost Ready for Concrete

bricks

Brick Layout Begins

 

Work on the larger patio will probably not begin until the spring thaw. A total of 86 4×8 bricks, 37 8×8 bricks and three benches were purchased during the campaign.

Thank you to all who contributed.